Sichuan-Tibet Railway Section 5
BACKGROUND
The Sichuan-Tibet Railway (川藏铁路) is a major railway project in China, connecting Chengdu in Sichuan Province to Lhasa in the Tibet Autonomous Region. It is the second major railway line into Tibet after the Qinghai-Tibet Railway. The railway is divided into three sections: Chengdu-Ya'an, Ya'an-Nyingchi, and Nyingchi-Lhasa.The Ya'an-Nyingchi section, which started construction in November 2020, is considered one of the most challenging railway projects in the world due to its complex geological conditions, fragile environment, and extreme climate. It will traverse through the Sichuan Basin, the Yunnan-Guizhou Plateau, and the Qinghai-Tibet Plateau, with significant elevation changes and numerous natural hazards such as avalanches, landslides, and earthquakes.
PROJECT CHALLENGE
The tunnel has a large burial depth, with severe seepage at the working face. The shotcrete takes a relatively long time to set and harden, has poor adhesion, and there is a large area of rebound and block falling.
The cement used on site is Yadong P.O42.5. The liquid finished product prepared with ART-HQ330 was tested for compatibility with the on-site cement. The test results are shown in Table 1. The use of ART-HQ330 allows for on-demand preparation. The mix proportion of C30 shotcrete is shown in Table 2.
Table 1 Comparison of Compatibility between Two Accelerators and Yadong Cement
Accelerators | Dosage/% | 1d Strength/MPa | Cement | Initial Setting/min:s | Final Setting/min:s |
ART-HQ330 | 7 | 8.9 | Yadong | 0.055555556 | 0.180555556 |
Original Accelerator | 8 | 4.1 | 0.159722222 | 0.364583333 |
Table 2 Mix Proportion of Shotcrete C30
Cement | Sand | Gravel | Water | Reducer | Accelerator |
(kg/m3) | (kg/m3) | (kg/m3) | (kg/m3) | (kg/m3) | (kg/m3) |
480 | 847 | 785 | 172 | 5.6 | 37.6 |
Table 3 Comparison of Field Usage of Two Accelerators
Accelerators | Dosage/% | Rebound amount/% | Spraying flatness | Remarks |
ART-HQ330 | 45815 | 45950 | Good | Successful spraying at seepage areas |
Original Accelerator | 45878 | > 40 | Poor | Severe block dropping and large rebound during seepage spraying |
Through trial spraying, the problems of severe block dropping and high rebound rate due to seepage on site were solved. The sprayed surface is smooth, and the spraying operation time was greatly reduced, effectively improving the construction progress. The usage effect was recognized by the tunnel construction team. Picture 1 below shows the construction site.
Picture 1 Construction site of a tunnel on the Sichuan-Tibet Railway
For detailed remixing formula, feel free to connect technician of ARIT.