Name
Sichuan-Tibet 318 Diversion Project
The project is part of the reconstruction of National Highway 318, specifically the section passing through Yajiang County. It involves the construction of a bridge spanning the Yalong River, named the "Yalong River Bridge." The bridge piers are approximately 70 meters in height. The construction method for the bridge involves cast-in-place beams, using a pumping process for concrete delivery. (Fig. 1).
Fig. 1 Schematic diagram of the site
The issue of appearance of bubble and compatibility
The construction part of the project is a cast-in-place beam, and the on-site pumping process is difficult to carry out. After a long pumping process through the pump pipes, the concrete experiences significant pumping loss and an increase in air content. Additionally, the overall workability of the concrete is relatively poor.
Mainly through the use of ART-M611, ART-M15 and ART-S33 independently developed by ARIT, the situation of large air content has been effectively alleviated, and the loss of on-site pumping has been effectively improved, and the overall workability of concrete has been significantly improved after pumping.
For detailed remixing formula, feel free to connect technician of ARIT.
Address
22 Huixin Road, Nanjing, China
Call us
Email us
Connect with ARIT for Premium Concrete Admixtures