Jiangsu ARIT new materials Co., LTD
Jiangsu ARIT new materials Co., LTD

Name

Shangqiu-Hefei-Hangzhou high-speed railway

shangqiu-hefei-hangzhou-high-speed-railway.webp


Line length

798km(496mi)


Operating speed

350km/h (217 mph)


concrete-drying-accelerator.jpg
concrete-frostproofer.jpg

Background

The Shangqiu-Hefei-Hangzhou High-Speed Railway, also known as the "Second East China Corridor," is a high-speed rail line connecting Shangqiu in Henan Province, Hefei in Anhui Province, and Hangzhou in Zhejiang Province. The Huai River Grand Bridge on the Shangqiu-Hefei-Hangzhou High-Speed Railway is approximately 17 kilometers long, with a main span of 228 meters, and at the time of construction, it held the world record for the largest span of a high-speed railway bridge with ballastless track. After the completion of the Huai River Grand Bridge, trains will pass over the Huai River at a speed of 350 kilometers per hour, taking only a few seconds, which means the bridge will bear a huge impact force. This poses extremely high requirements for the construction quality of the project. 


Project challenge

The on-site construction used the Type III slab track technology without ballast, which requires concrete with a low slump of 80mm to 140mm and a slump loss of no more than 20mm within 2 hours. 


Solution from ARIT

ARIT customized a product of high-performance water reducing admixture specifically for the purpose with low-sensitivity to slump-retaining, which well met the "three lows and one high" requirements for the base slab concrete construction.

Product from ARIT

ART-JR

For detailed remixing formula, feel free to connect technician of ARIT.


Have Any Questions?

Connect with ARIT for Premium Concrete Admixtures

Leave a Message