Background

The project is an important part of the Hangzhou-Ningbo Expressway Duplication Line, a national expressway. It also serves as a vital transport corridor for the collection and distribution of goods for the Ningbo-Zhoushan Port. With a total length of 26.15 kilometers, it is constructed on a two-way and six-lane expressway with a design speed of 100 kilometers per hour.After the completion of the project, the Liuheng Highway Bridge and the Hangzhou-Ningbo Expressway Duplication Line will be directly connected. Vehicles traveling from Meishan and Liuheng will be able to reach Zhoushan, Shaoxing Coastal Area, and Hangzhou without having to detour through the urban area of Ningbo.


Project challenge

The appearance of the C40 test pier on site is densely covered with bubbles (Figure 1), most of which are defective pores. When the condition is severe, the upper layer is densely packed with small bubbles, and a relatively thick layer of floating slurry appears after vibration. In addition, the project requires that no thick layer of floating slurry shall appear on the surface of the concrete after vibration. After forming, the pier body surface shall be free of dense bubbles and obvious water ripples.


Appearance_of_field_test_pier.png 

Fig.1 Appearance of field test pier


Solution from ARIT

The concrete mixture is high in slag content and lacks slurry, so choose the origin liquor with better slurry lifting performance (ART-M13 and ART-M15) or increase the sand rate; Inappropriate combination of air entraining agent and defoaming agent, try to mix different defoaming agent and air entraining agent; Site concrete slabs, hard, mix ratio design may be unreasonable, mix ratio.


Product from ARIT

ART-M13、ART-M15

For detailed remixing formula, feel free to contact technician of ARIT.